Role and authorization matrix
Which role may do which task on a lift, from staying clear of the fall zone to directing the lift. Each row shows the condition that controls it, the citation, and whether it comes from OSHA law, a consensus standard or industry practice.
The employer decides who is qualified and assigns each person's tasks and limits. Qualification is scope-specific: a code of A means the task is part of the role, not that every person in that role is qualified for every load.
Codes
Source type
| Activity | Worker near the lift | Lift Crew Member | Rigger in Training | Qualified Rigger | Lift Director | Crane Operator | Condition / note | Citation and source |
|---|---|---|---|---|---|---|---|---|
| Every lift | ||||||||
| Recognize fall-zone, swing-radius, crush, pinch-point and line-of-fire hazards | A | A | A | A | A | A | Anyone assigned to work on or near the equipment must be trained on these hazards. | 1926.1424(a)(1); 1926.1430(e) OSHA law |
| Work near the lift outside the barricaded area and fall zone | A | A | A | A | A | A | Follow barricades, warning lines and the lift director's area controls. | 1926.1424(a)(2) OSHA law |
| Enter the fall zone | N | C | C | C | C | N | Only to hook, unhook or guide a load, make the initial connection, or receive a load being landed. Training alone never permits entry. | 1926.1425(b),(d) OSHA law |
| Work directly under a suspended load | N | N | N | N | N | N | Prohibited during tilt-up and tilt-down. ASME B30 volumes direct personnel to stay clear of suspended loads; treat as not allowed for every lift. | 1926.1425(e)(1); ASME B30.5 Chapter 5-3 OSHA law Consensus Verify |
| Give a stop or emergency stop signal | A | A | A | A | A | A | Anyone who becomes aware of a safety problem must give the stop or emergency stop signal. The operator must obey it. | 1926.1417(y) OSHA law |
| Stop the work for a safety concern | A | A | A | A | A | A | The operator has explicit authority to stop and refuse to handle loads (1926.1418). Others act under the employer's stop-work program. | 1926.1418; employer program OSHA law Industry practice |
| Load handling | ||||||||
| Guide a load with a tag line or hands-free device | N | A | A | A | N | N | Use a tag or restraint line where load rotation would be hazardous. Stay out of the fall zone unless guiding requires it. | 1926.1417(w); 1926.1425(b)(1) OSHA law |
| Touch or push a freely suspended load by hand | N | C | C | C | N | N | Keep hand contact to a minimum. Use hands-free methods where practicable and keep a clear escape path. | Employer program Industry practice |
| Receive and land a load | N | C | C | C | N | N | Only employees needed to receive the load may be in the fall zone while it is landed. | 1926.1425(d) OSHA law |
| Hook or unhook a load | N | C | S | A | N | N | Lift Crew Member hooks onto rigging already made up by a Qualified Rigger. In the fall zone: materials rigged to prevent displacement, self-closing latches, rigged by a Qualified Rigger. | 1926.1425(b)(1),(c) OSHA law |
| Make the initial connection of a load to a structure or component | N | C | S | C | N | N | Example: setting a load onto anchor bolts. The same three fall-zone conditions apply, and only necessary employees may be exposed. | 1926.1425(b)(2),(c) OSHA law |
| Rigging | ||||||||
| Select slings, shackles, hooks and other rigging hardware | N | N | S | A | N | N | Selection stays within the rigger's shown scope. Hardware must have legible rated-load markings and not be loaded beyond them. | 1926.1401; 1926.251(a)(2); ASME B30.9, B30.26 OSHA law Consensus |
| Choose the hitch and rigging configuration | N | N | S | A | N | N | A trainee may assist; the supervising Qualified Rigger keeps control of the configuration. | 1926.1401; 1926.1425(c)(3); ASME B30.9 OSHA law Consensus |
| Determine load weight and center of gravity | N | N | S | A | C | N | Lift Director confirms weight and center of gravity against the lift plan; the rigger determines them for the rigging. | ASME B30.5 Chapter 5-3; ASME B30.9 Consensus Verify |
| Calculate sling tension and sling-angle effects | N | N | S | A | N | N | Within the rigger's shown ability for the configuration. | ASME B30.9 Consensus |
| Use a below-the-hook lifting device (spreader, lifting beam, vacuum, magnet) | N | N | S | A | N | N | Use within the device's rated load and the manufacturer's instructions; the device must be marked and inspected. | ASME B30.20; ASME BTH-1 Consensus |
| Inspect rigging before use each shift | N | N | S | Q | N | N | Slings, fastenings and attachments are inspected each day before use by a competent person the employer designates. Many employers designate their qualified riggers. Add-on: Rigging Hardware Inspector (competent person) | 1926.251(a)(1),(a)(6) OSHA law |
| Stop using damaged rigging and report it | C | C | C | A | A | A | Anyone who sees damage should stop its use and report it. The competent person removes defective gear from service. | 1926.251(a)(1),(a)(6) OSHA law Industry practice |
| Perform documented periodic inspection of slings and hardware | N | N | N | Q | N | N | Periodic inspection intervals and records follow the applicable ASME volume and the employer's program. Add-on: Rigging Hardware Inspector (competent person) | ASME B30.9; ASME B30.26; 1910.184(e)(3) (general industry) Consensus Verify |
| Rig routine loads without supervision | N | N | N | A | N | N | Limited to the loads, rigging, equipment and conditions included in the person's qualification. | 1926.1401; 1926.1425(c)(3) OSHA law |
| Directly supervise a Rigger in Training | N | N | N | A | N | N | Supervising rigger stays with the trainee and keeps responsibility for the rigging. | Employer program; ASME B30 rigger qualification provisions Industry practice Consensus Verify |
| Rig for crane assembly or disassembly | N | N | N | A | N | N | Done under the A/D Director's supervision. | 1926.1404(r) OSHA law |
| Rig unstable, eccentric, unusually heavy, engineered, tandem or multi-crane loads | N | N | N | Q | N | N | Routine qualification does not automatically cover these scopes. Follow the lift plan and any engineering controls. Add-on: Scope-specific rigging qualification | 1926.1401; 1926.1432; ANSI/ASSP A10.42 OSHA law Consensus Verify |
| Signals and communication | ||||||||
| Decide that a signal person is needed | N | A | A | A | A | A | Required when the point of operation or travel path is not in full view of the operator, or when the operator or the person handling the load decides one is needed. | 1926.1419(a) OSHA law |
| Give operational signals to the operator | N | Q | Q | Q | Q | N | Only within the signal methods the person was qualified for (hand, voice, audible, new signals). Add-on: Signal Person | 1926.1419; 1926.1428 OSHA law |
| Act as a dedicated spotter near power lines | N | Q | Q | Q | Q | N | Spotter must meet Signal Person qualification, stay positioned to judge clearance and have no other duties while spotting. Add-on: Dedicated spotter (Signal Person qualification) | 1926.1401; 1926.1407-1411; 1926.1428 OSHA law |
| Planning and directing the lift | ||||||||
| Develop or approve the lift plan | N | N | N | C | A | N | Multi-crane lifts must be planned by a qualified person, with engineering expertise when that person decides it is needed. For other lifts, follow the employer's lift-planning program; a rigger may prepare the rigging portion. | 1926.1432(a); employer program OSHA law Industry practice |
| Lead the pre-lift meeting or plan review | N | N | N | N | A | N | Required for multi-crane and personnel lifts; common practice for all planned lifts. Crew members involved attend. | 1926.1432(b)(2); 1926.1431(m) OSHA law Industry practice |
| Set and control the fall zone, barricades and access | N | N | N | C | A | N | A rigger may set controls as directed by the Lift Director. | 1926.1424(a)(2); 1926.1425 OSHA law |
| Confirm ground conditions, crane setup and mats | N | N | N | N | A | A | The controlling entity must ensure adequate ground conditions. The Lift Director and operator confirm setup before the lift. | 1926.1402; ASME B30.5 Chapter 5-3 OSHA law Consensus Verify |
| Call a weather or wind hold | N | N | N | N | A | A | The competent person must adjust the equipment or operation for the effect of wind, ice and snow on stability and rated capacity, within the manufacturer's limits. | 1926.1417(n); manufacturer's instructions OSHA law |
| Direct the lift and the people involved | N | N | N | C | A | N | A rigger directs rigging tasks within their scope. On multi-crane lifts, the director must be both a competent and a qualified person, or a competent person assisted by qualified persons. | 1926.1432(b)(1); ASME B30.5 Chapter 5-3 OSHA law Consensus Verify |
| Hoist personnel in a platform | N | C | N | C | C | C | Only under every condition of 1926.1431, including the pre-lift meeting and trial lift. Rigging used for the platform is used for nothing else. | 1926.1431 OSHA law |
The roles in the columns
Worker near the lift
Anyone working on or near crane and rigging work who has no assigned part in the lift.
Minimum: Trained on swing-radius, crush and pinch-point and fall-zone hazards for the work area.
Boundary: Stays outside the barricaded area and fall zone. May give a stop signal and report hazards.
1926.1424(a); 1926.1430(e)
Lift Crew Member OSHA law
Helps with the lift: tag lines, receiving and landing, hooking onto rigging made up by a Qualified Rigger, initial connection.
Minimum: Hazard training for the tasks assigned; fall-zone rules; attends the pre-lift or plan-review meeting when required.
Boundary: Does not select, configure, inspect or accept rigging. Signals only if also a qualified Signal Person.
1926.21(b)(2); 1926.1425; 1926.1430(a),(e),(f),(g); 1926.1431(m); 1926.1432(b)(2)
Role page →Rigger in Training Industry practice
Employer-defined step: a person learning rigging tasks before being found qualified.
Minimum: Employer training on hardware, hitches, sling angles, load weight and center of gravity, and inspection.
Boundary: Does rigging tasks only under direct supervision of a Qualified Rigger, who keeps responsibility for the rigging.
Employer program; ANSI/ASSP A10.42 (verify current edition)
Qualified Rigger OSHA law
A rigger who meets the criteria for a qualified person for the rigging being done.
Minimum: Shown ability to rig the specific loads, hardware and configurations assigned. Qualification is scope-specific.
Boundary: Limited to the loads, lifts and rigging within the person's shown ability. Complex scopes need qualification for that scope.
1926.1401 (definition); 1926.1425(c)(3); 1926.1404(r); 1926.1430(d),(g)
Role page →Lift Director OSHA law
The person who directs the lift: plan review, crew briefing, area control and go/no-go.
Minimum: Competent person and qualified person for the lift (or a competent person assisted by qualified persons) on multi-crane lifts; ASME B30.5 lift director duties on every lift (consensus).
Boundary: Does hands-on rigging or signaling only if also qualified for that role.
1926.1432(b); 1926.1430(d),(g); ASME B30.5 Chapter 5-3 (verify paragraph)
Role page →Crane Operator OSHA law
Operates the crane. Included here for the authority to stop and to call for a signal person.
Minimum: Certified or qualified under 1926.1427 and evaluated by the employer.
Boundary: Has authority to stop and refuse loads when safety is in question. Does not rig from the controls.
1926.1427; 1926.1418; 1926.1419(a)
Role page →Add-on qualifications
These can be held on top of any role. Where a row shows Q, the person needs the add-on named in that row.
Signal Person OSHA law
Gives operational signals to the operator. Can be added to any role.
Minimum: Qualified by a third-party qualified evaluator or the employer's qualified evaluator; knows signal types, equipment operation and limits; oral or written test plus practical test.
1926.1428; 1926.1419-1422; 1926.1430(b)
Role page →Dedicated spotter (power lines) OSHA law
Watches clearance to energized lines and warns the operator. No other duties while spotting.
Minimum: Must meet the Signal Person qualification requirements.
1926.1401 (definition); 1926.1407-1411; 1926.1428
Role page →Rigging Hardware Inspector (competent person) OSHA law
Employer-designated competent person who inspects slings and rigging and removes defective gear.
Minimum: Designated by the employer; able to identify hazards and authorized to take corrective action.
1926.251(a)(1),(a)(6); 1910.184(d); ASME B30.9 / B30.26 periodic inspection (consensus)
Role page →Scope-specific rigging qualification OSHA law
Qualification for loads beyond routine work: unstable, eccentric, unusually heavy, engineered, tandem or multi-crane rigging.
Minimum: Shown ability for that specific scope; routine qualification does not carry over.
1926.1401 (qualified person); OSHA qualified-rigger guidance; ANSI/ASSP A10.42
Role page →Notes
Construction work under 29 CFR 1926 Subpart CC and 1926.251, with general industry references (1910.184) where noted. Shipyard, longshoring and state-plan rules can differ; check the State & local page.
A powered industrial truck configured to hoist and lower (by winch or hook) and move a suspended load is covered by Subpart CC (1926.1400(c)(8)). Treat that lift like a crane lift in this matrix.
One person can hold several roles, for example a Qualified Rigger who is also a Signal Person. They may do the tasks of each role they are qualified for. A Lift Director or Crane Operator does hands-on rigging only if also qualified for it.
This is an employer-defined step, not an OSHA role. OSHA does not define a rigger trainee; the 'S' code reflects common industry practice and ASME B30 provisions for trainees working under a qualified rigger.
Not a lift role. Shown so the matrix makes clear what hazard training alone does and does not allow.
OSHA requires shown qualification but prescribes no exam format for riggers. ASME B30 rigger qualification provisions call for written and practical evaluation (consensus).
OSHA requires an oral or written test and a practical test (1926.1428).
Keep enough evidence to show each person's qualified scope, limits, equipment and tasks. See each role page for its record checklist.
References
- 29 CFR 1926 Subpart CC Cranes and Derricks in Construction (1926.1400-1442) source
- 29 CFR 1926.251 Rigging equipment for material handling source
- 29 CFR 1926.21 Safety training and education source
- 29 CFR 1910.184 Slings (general industry) source
- OSHA guidance Subpart CC: Qualified Rigger fact sheet (Oct 2010) source
- OSHA guidance Subpart CC: Signal Person Qualification fact sheet (Oct 2010) source
- ASME B30.5 Mobile and Locomotive Cranes (personnel qualifications and responsibilities, Chapter 5-3) source
- ASME B30.9 Slings source
- ASME B30.10 Hooks source
- ASME B30.20 Below-the-Hook Lifting Devices source
- ASME B30.26 Rigging Hardware source
- ASME BTH-1 Design of Below-the-Hook Lifting Devices source
- ANSI/ASSP A10.42 Safety Requirements for Rigging Qualifications and Responsibilities (verify current edition) source
Rows marked Verify cite ASME paragraph-level or edition details that should be checked against the current standard.